Back

SAP PP practice system on live S/4HANA 2023

On this page

This page is SAP PP — Production Planning. Practise BOMs, MRP and production orders on the same SAP user. Exact work centres and BOMs are tenant facts.

Process

What you open after login

Display the BOM, check MRP, create or confirm a production order, then see component issue and GR in MM. A full MRP live run on the plant is a tenant fact.

  1. BOM and routing
  2. MRP / MD04
  3. Production order
  4. Confirmation
  5. GR to stock
  1. BOM first

    CS03 for a finished material before you create an order.

  2. Coverage

    MD04 stock/requirements for that material.

  3. Confirm

    CO11N on an order you created or an assigned sample.

  4. Settlement

    CO settlement is the FICO page — same user.

Master

BOM, routing and MRP

A BOM and routing must exist before a realistic production order. MRP Live is on this tenant when assigned.

Bill of material

CS01 / CS02 / CS03. Alternative BOMs and usage are tenant facts.

CS01CS02CS03

Work centre

CR01 / CR03. Capacities may be empty — that is tenant data, not a missing PP.

CR01CR03

Routing

CA01 / CA03. Operations, control keys and components allocation sit here.

CA01CA03

Master recipe

C201 / C203 if this tenant uses PP-PI. Discrete routing is the usual drill.

C201C203

MRP views

The material must have MRP type, lot size and strategy or MD04 will not plan it.

MD04

MRP Live

MD01N when assigned. MD04 is the daily look even when a plant-wide run is restricted.

MD01NMD04

Order

Production order and confirmation

Create, release, confirm and receive the finished material. Component issue and GR update MM on the same user.

Create / display

CO01 / CO02 / CO03. Process order COR1 / COR3 if PP-PI is assigned.

CO01CO02CO03COR1COR3

Release

Release the order before confirmation. Missing release is often status, not authorisation.

Confirm

CO11N / CO15. Time tickets and yield are tenant facts.

CO11NCO15

Goods

Backflush or MIGO component issue, then GR for the header material.

MIGO

Cost

Planned vs actual on the order. Settlement CO88 / order settlement sits with CO on FICO.

CO88

Not a private MES

This is S/4 PP on a shared tenant. Shop-floor execution systems are not sold here.

Planning

Demand, capacity and variant

Planning extras exist when assigned. Do not invent a demand management landscape that is not on this login.

Planned independent requirements

MD61 / MD63 when assigned.

MD61MD63

Planned order

Convert from MD04 or CO40 when assigned.

MD04CO40

Capacity

CM01 work-centre load if capacities are maintained.

CM01

Repetitive

MF50 / MFBF only if REM is active — ask before you buy.

MF50MFBF

Variant configuration

Not guaranteed. Ask if your exam needs a configurable material.

PP/DS

Advanced planning is not a separate hub. If PP/DS apps are missing, that is a tenant fact.

How PP connects

PP ↔ MM

Components and GR update stock. Depth: SAP MM.

PP ↔ QM

Inspection lots can trigger from production. Depth: SAP QM.

PP ↔ CO

Order settlement to cost objects. Depth: FICO.

PP ↔ PLM

Engineering BOM change is PLM. Depth: PLM.

Fiori apps on this login

These apps are here to open and practise when they are assigned. Use App Finder after login. A GUI transaction is not a native F-number Fiori app.

Planning

  • Monitor Material Coverage (F0247)
  • Manage Production Orders (F0266)
  • Display Planned Independent Requirements

Execution

  • Confirm Production Order Operation
  • Manage Work Center Queue
  • App Finder for further PP apps

PP transaction codes

GUI transactions on this login so you can practise processes when they are assigned. Practice = a process you can run. Tenant fact = confirm before you buy. Full list: SAP transaction codes.

Swipe sideways to see all columns

PP transaction codes
Component Area Transaction Purpose Type Use
PP BOM CS01 / CS03 Material BOM SAP GUI Practice
PP Work centre CR03 Work centre SAP GUI Practice
PP Routing CA01 / CA03 Routing SAP GUI Practice
PP MRP MD04 / MD01N Coverage / MRP Live SAP GUI Practice
PP PIR MD61 / MD63 Independent requirements SAP GUI Practice if assigned
PP Order CO01 / CO02 / CO03 Production order SAP GUI Practice
PP Confirm CO11N / CO15 Confirmation SAP GUI Practice
PP Process COR1 / COR3 Process order SAP GUI Practice if assigned
PP Capacity CM01 Capacity evaluation SAP GUI Practice if assigned
MM Stock MMBE Header / component stock SAP GUI Practice
CO Settle Order settlement To cost object — FICO SAP GUI Use FICO

Three drills to run after login

Order cycle

CS03CO01CO11N → stock in MMBE.

CS03CO01CO11NMMBE

MRP look

MD04 for a finished material that has a BOM.

MD04

Confirm only

If order create is tight, display CO03 and confirm CO11N on an assigned sample order.

CO03CO11N

Certification practice

This is the live SAP user. It is not the exam, a voucher, coaching, dumps, or a pass. Use official SAP Learning for the bookable code. We will not invent an exam code.

  • Production planning practice with your own SAP Learning
  • Related MM

Certification practice hub · Certification guide

Included — and not

Included

  • Your own SAP user on live SAP S/4HANA 2023
  • SAP GUI and Fiori Launchpad
  • Authorised processes on this page when they are assigned
  • Related modules on the same user
  • Credentials in 2–5 minutes (portal, email, WhatsApp if opted in)

Not included

  • Courses, tutors, exam vouchers or a pass guarantee
  • SAP BASIS administration or a private production copy
  • A local SAP install, ECC, IDES, or a free login
  • A second dedicated server for this module

What you buy

Protected purchase

Pay once. Time is doubled. Amount is not locked on this page.

  • No automatic renewal
  • You keep double the months you pay for
  • Checkout shows your country’s amount
  • Retail refund: 7 days from portal delivery

One SAP user on the shared live system. This page does not lock a catalogue figure.

ERP Server Access is independent and is not affiliated with or endorsed by SAP. SAP and other SAP marks are trademarks of SAP SE or an SAP affiliate company.

Module page last reviewed: 14 September 2026 · Live system: SAP S/4HANA 2023

Module FAQ

What is SAP PP server access?

Your own SAP user on live SAP S/4HANA 2023 for Production Planning. Access only.

What can I practise in PP?

BOMs, routings, MRP Live and production orders when assigned.

Is PP/DS a separate page?

PP/DS is not a separate hub. This page is PP on the shared tenant.

MRP Live?

MD01N when assigned.

Is this SAP PP training or a free server?

No. Paid system access only. No courses, tutors, exam vouchers, dumps, or a free login.

How do the 1, 2 and 3 month plans work?

You pay once. There is no automatic renewal. You keep double the time you pay for: 1+1, 2+2 or 3+3 months.

What is the refund?

The retail refund window is 7 days from portal delivery. Read the refund policy before you buy. Do not send passwords to support.

Is this for certification?

Live practice with your own SAP Learning.